Chapter 72 Completed


Previous Chapter Table of Content Next Chapter

  Chapter 72
  After the completion of the project and the goal set, the twelve Qiming people lived a very fulfilling life every day, with each person having a clear division of labor and performing their respective duties.

  By the third day, Chen Mu had made all the pipes according to Tang Jing's requirements. These pipes were placed on the ground and covered everywhere.

  The next step is installation.

  Regarding this point, after discussing this with Tang Jing, he planned to dig out some protruding brackets on the wall. On the one hand, they were used as scaffolding for climbing, and on the other hand, they could be used to fix and place pipes.

  This workload is not much easier than making a pipeline, but Chen Mu's mental power and control power are growing at an alarming rate every day, and it is becoming easier and easier to do these things.

  This morning.

  Chen Mu and He Ying were still the first to get up.

  He Ying still had the habit of going out for a walk early in the morning, and when he came back, he would challenge Chen Mu.

  Over the past two days, it has almost become a habit.

  Chen Mu also dreamed of this kind of practical combat opportunity. The two of them regarded it as a daily training routine and got together in the morning with a very tacit understanding.

  certainly.

  So far, He Ying has not won. Every battle will end with Chen Mu restraining her with one hand.

  After breakfast.

  Chen Mu found Wei Dalei who was about to move the pipe.

  "Old Wei, after the water diversion project is completed, I will build a separate room for you."

  Wei Dalei was stunned for a moment, then waved his hand and said, "No, it's fine if we all sleep together." "

  You're welcome."

  "You're welcome, It's really good."

  "You're welcome. With my current ability, I can build a room very quickly. In the future, each of us will have our own room, but you are the first one." "Then give it first

  . Let others do it."

  "No, you have to be the first."

  "As a member of the five-person decision-making group, I should lead by example and not have any privileges." Wei Dalei spoke righteously and looked very conscious.

  "Damn, do you have to tell me that you snore so loudly that it affects our sleep?" Chen Mu said angrily.

  "Ah?"

  Wei Dalei touched his head a little embarrassedly: "Is it that loud?"

  "Yes!"

  The people next to him said in unison.

  Dong Junwei smiled and said: "Even us girls can hear it."

  Wei Dalei chuckled and said: "No wonder my mother would kick the door of my room sometimes at night to wake me up without telling me anything."

  Snoring It was obviously meaningless to blame the person involved for this kind of thing, so although everyone suffered deeply, there was nothing they could do about it. Fortunately, after a few days, everyone seemed to have gotten used to it.

  On the girl's side, because the room is separated, although she can still hear it, the sound is much quieter. In Zhao Xiaoyan's words, it can now be listened to as a lullaby. If one day she can't hear it anymore, she might not be able to sleep.

  But the boys are more troubled.

  The sleep quality of Chang Junyan, Sun Yuan and others was okay. As long as they went to bed earlier than Wei Dalei every day, it wouldn't be a big problem.

  But Chen Mu probably lacked a sense of security since he was a child. He has always been a light sleeper and would wake up if there was any disturbance.

  therefore.

  The plan to let Wei Dalei move out must be carried out in advance.

  ...

  The water diversion project has finally reached its final stage. After the sedimentation tank is constructed, all that remains is the splicing and installation of pipes.

  This is also thanks to Tang Jing's humanoid computer, which can accurately calculate all the parts in advance. Otherwise, Chen Mu would have to make the pipes while installing them, which would obviously be much less efficient.

  But when it comes to actual installation, it's still very difficult.

  First of all, the one centimeter diameter pipe is still too big for people at this time. Although transportation is not a problem, it needs to be transported to a high place, then aligned, and then glued by Chen Mu, and then fixed on the bracket. This is more troublesome.

  At least someone had to help Chen Mu hold the pipe.

  Otherwise, it would be really difficult for him to do it alone.

  Originally, Wei Dalei was the most suitable person to do this job, but it was a pity that Wei Dalei's fear of heights was not alleviated at all by his supernatural powers.

  Fortunately, there is He Yingzai.

  He Ying is stronger than the average girl in terms of strength, and with her "Qing Gong", she can easily climb up and down.

  After Chen Mu finished making the wooden door and the brackets and handles on the wall, He Ying would often climb on top to take a look, and even used it as a means to exercise his abilities.

  obviously.

  Her movements and speed in climbing were countless times more proficient than Chen Mu's, which made everyone envious. After all, even if they knew that no one could be killed by falling from this height, no one could survive the mental barrier. I don’t dare to really try this kind of bungee jumping without safety measures.

  ...

  With the full cooperation of He Ying and Chen Mu.

  The installation of all pipelines was finally completed at noon on the seventh day of the project.

  At this time, the entire huge project has basically been completed.

  A plastic pipe with a diameter of one centimeter is connected from the outdoor rainwater riser. After passing through the wooden door, it falls to the ground in a semicircular arc, and then is discharged outside through the crack of the door.

  At a height of 13 centimeters from the ground, a water inlet with a diameter of 5mm was opened in this pipe.

  As long as it rains, this water inlet can be opened, and water can be continuously poured into the sedimentation tank. After passing through the grille and sedimentation, it enters the water storage tank.

  Both sedimentation tanks and water storage tanks are equipped with bottom drain pipes, because over time, even in water storage tanks with relatively clean water quality, there will be solid sediments, which naturally need to be removed.

  At the highest water level of the sedimentation tank, an overflow pipe is also installed, which together with the sewage pipe leads to the outdoors.

  For the time being, there is no other use for this drainage pipe, but Tang Jing and Chen Mu's plan has reserved it for the toilet for flushing.

  It’s just that the current toilet does not have a drainage function, so it can only be put on hold for the time being.

  Wait until everything is done.

  There is no need for Chen Mu to intervene in the subsequent cleaning work.

  His subsequent task is to wait until the next rain to conduct a trial run of the entire project. If there is a pipe leak in the process, or the water flow is not smooth in some places, he will need to make subsequent repairs.

  It's been about half a month since the end of the world.

  It's almost June.

  Children's Day is no longer available.

  Even if there were, there are no longer holidays in high school.

  But entering June means that summer has officially arrived, followed by the rainy season.

  According to the city's climate practices, there is no need to worry about insufficient rain until at least October.

  The more than four months in between are the critical period after the end of the world. Whether humans can continue to control the world may depend on this period of time.

  Four months is too long.

  A group of people are now eagerly waiting for the rain.

  (End of chapter)

Previous Chapter Table of Content Next Chapter