Chapter 150 Company
"Almanacs have always had different versions, and no one accepted them. Now that we have computers, it has become easier to write almanacs." Tang Jing explained.
"Then why do you say this is genuine?" Chen Mu asked.
"Actually, no one is right or wrong." Tang Jing said with a smile: "It's just that in the Qing Dynasty, there were more and more versions of almanacs, and they often contradicted each other. Emperor Qianlong ordered a unified version, and then there was That "Associated Discipline Defense Book"."
"Okay."
Chen Mu still had only half-understanding and asked, "So, are you really going to do things according to the above in the future?" "
Such a mysterious thing, just treat it as a joke. That's all, I don't really believe it." Tang Jing said with a smile.
"Then you still spend so much time writing?" Chen Mu was speechless.
"What else?" Tang Jing spread her hands: "We have paper and pen, so we have to write something. I will write down the Dream of Red Mansions now, and you have to have time to read it. The almanac just happens to read one page every day, and the picture will be fresh. Interesting. Moreover, history books record the past, and almanacs look forward to the future, echoing back and forth. Isn't it great?"
This reason was so powerful that Chen Mu was speechless.
...
But don’t say it yet.
With these two "books", everyone's daily spiritual life has become much richer.
After a busy day.
Everyone will sit together on towels and participate in writing today's history.
It feels like everyone is writing a diary together.
Before this time, it was the time when everyone was most relaxed. Everyone was standing around, walking or sitting on the white towels casually.
Above the head is a street lamp that rises from the ground and then bends down.
The lamppost was made by Chen Mu, and the light bulb was naturally Dong Junwei’s masterpiece.
The light is not very bright, and in order to avoid exposure, I only light it for a while every day when the sky is semi-dark.
But the atmosphere was extremely pleasant.
Everyone said something to each other, slowly helping Tang Jing complete today's diary. While recording, they also recalled what happened that day.
There are about twenty people, and there are always some interesting anecdotes every day.
For example, when Wei Dalei and Zhao Xiaoyan were moving things together today, Wei accidentally carried the goods with Zhao Xiaoyan; another example is that
every time Du Jiajia met Xiao Huang, she would secretly bring back a few cat hairs, and Dong Junwei collected them all. Get up and say you can knit a few sweaters in the future.
...
The lift to the observation deck is under construction in full swing.
The most difficult part is the steel pillars used as tracks.
An elevator requires four rails, and the height of 80 centimeters means that these rails cannot be too thin, otherwise they will bend.
Unlike the steel pipe used as a sliding pole, the human weight is almost negligible, but the lift is different. Once the track is slightly bent, the lift will become stuck and unable to operate normally.
In the end, these four rails were made about the thickness of a person. From the previous perspective, they were probably similar to knitting needles. They were made of pure stainless steel, so there was no problem in terms of hardness.
The lifting platform is made of lighter plastic, and the friction with the metal track will be easier to control.
As for the cable, I originally planned to use cotton thread, but the life of this thing is too short, and it will probably break after a few days of friction with the pulley.
But if you use metal and plastic, the flexibility cannot be achieved. After all, the function of this thing is a rope.
Finally, Chen Mu made up his mind to make a real chain.
It is the kind of iron chain made of countless oval iron rings connected together.
The height of the lift is 80 centimeters, but the length of the chain is much longer than this.
It seems unreliable to make such an iron chain by hand.
But there seems to be no other option at the moment.
Fortunately, this kind of simple structure and mass production is not difficult for Chen Mu. Once he becomes proficient, the speed can be passed.
The chief engineer is still Tang Jing.
She calculated all the needed structural parts and parts, and then worked out the dimensions for Chen Mu. After all the parts were manufactured, she assembled them one by one.
About a week.
The two lifts on the left and right are finally completed.
Du Jiajia excitedly went up to experience it first.
Because the up and down movement is achieved purely by changing the weight of the counterweight, the acceleration is constant, so the initial speed cannot be too fast, otherwise the person may be ejected in the end.
Of course, there is a manual braking device on the lifting platform so that the lift can slow down or stop when the speed is too fast.
Although this project is not as significant as the water diversion device, the difficulty and complexity of the construction are still greater.
However, during the entire construction process, there were actually not many people involved. There were only six people in total.
Tang Jing is the chief engineer;
Chen Mu is the material and process supplier;
Wei Dalei is the porter and actual installer;
Lu Liangliang and Lu Shanshan provide material processing services;
He Ying is the supervisor, responsible for the supervision and inspection of the entire project, mainly jumping up and down The test lift platform meets the standards in all aspects.
It took six people a week to build this massive project. From a current perspective, this set of lifts is equivalent to a large building 80 meters high, which was unimaginable before.
Tang Jing suggested that the six of them could set up a company called "Qiming Architectural Design Co., Ltd." with Chen Mu as the legal representative and herself as the chief designer.
The purpose of establishing this company is to build various construction equipment needed for Qiming.
According to Tang Jing, Qiming Architectural Design Co., Ltd. is a construction company with general contracting qualifications that can provide one-stop services such as design, construction, and decoration.
The next project is the construction of bathrooms and renovation of toilets.
Tang Jing has a long-term plan, and has even thought about it. After human society reaches stability, she may expand her business, such as building residential buildings for Qingbei, or simply building a monument for them.
Chen Mu felt that this joke was very classy, so he did not shirk the title of legal representative. He also encouraged the remaining five people in the tone of a boss, saying that by the end of the year, if the company performed well, he would give everyone a considerable bonus. Year-end awards.
There is no performance. The company currently does not have any profitable projects. Of course, the remuneration of employees does not need to be a headache for Chen Mu.
However, at the Qiming plenary meeting held every seven days, Dong Junwei approved the establishment of Qiming Architectural Design Co., Ltd. as chief decision-making officer, appointed Chen Mu as the legal representative, and issued a business license produced by Tang Jing.
Be inspired by this.
Tang Jing suggested that a set of corporate laws should be formulated to stipulate the processes and procedures for establishing a company, as well as the requirements for operations, cancellation and other steps.
Everyone almost laughed at him.
There are only seventeen people in total, but they have to formulate some kind of corporate law. One person has one company, and there are only seventeen companies...
If the person who said this was not Tang Jing, he might have been trolled to death.
(End of chapter)